logo

800.626.0054

 
  Interface Consulting X Logo    
  • Home
  • About Interface
    • Overview
    • News and Press Releases
    • Case Studies
    • Interface Articles
    • Employment Opportunities
  • Expert Services
    • Construction Claims & Disputes
      • Construction Delay Claims
      • Labor Productivity Claims
      • Design and Construction Defect Claims
      • Force Majeure Claims
      • Acceleration Claims
      • Suspension and Termination Claims
      • Differing Site Conditions Claims
      • Change Claims
    • Construction Defects
    • CPM Schedule Analysis
      • Windows Analysis or Contemporaneous Period Analysis
      • Time Impact Analysis (TIA)
      • Collapsed As-Built
      • Impacted As-Planned
      • As-Planned vs. As-Built
    • Construction Management
      • Contract Administration
      • Implementation of Project Controls
      • Execution of Processes and Procedures
      • Change Management
      • Risk Management
    • Litigation & Arbitration
      • Prudence Evaluation Experts
      • International Arbitration Construction Experts
      • Labor Productivity Analysis Experts
      • Schedule Delay Experts
      • Damage Quantification Experts
      • Design & Construction Defects Experts
      • Acceleration Experts
      • Suspension & Termination Experts
      • Force Majeure Experts
      • Differing Site Conditions Experts
      • Construction Change Experts
      • Standard of Care
    • Project Advisory
      • Construction Readiness Assessment
      • Contracting Strategy Development
      • Cost Risk Assessment
      • Project Audit
      • Project Execution Planning
      • Project Framing
  • Industries Served
    • Buildings & Facilities
      • Buildings
        • Education
        • Government Buildings
        • Commercial Buildings
        • Retail
      • Healthcare
      • Entertainment, Sports & Convention Centers
      • Industrial & Manufacturing
      • Multifamily Housing & Hotels
        • Multifamily Housing
        • Hotels
    • Transportation & Infrastructure
      • Airports
      • Heavy Civil
      • Roads, Highways, Bridges & Rail
      • Utilities
      • Water & Wastewater Treatment
    • Oil & Gas Pipelines
      • Land Pipelines
      • Subsea Pipelines
    • Marine & Offshore Production
      • Offshore
      • Ports, Piers & Wharfs
      • Shipbuilding & Vessels
    • Power & Energy
    • Chemical & Petrochemical
    • LNG & NGL
    • Oil & Gas Processing
    • Refining
    • Megaprojects
  • Interface Experts
    • Sam Barakat, PE, Esq., PSP
    • Jacob P. Hammond, CST
    • Lisa Sumner Heard
    • Dennis R. Jasinski, Fellow – ICCP
    • Mohamed W. Khazragui
    • Angela E. Lopez
    • Karen P. Matthews
    • Nicholas V. Ninan
    • Gabriel Paglicawan
    • Tapan Patni
    • Christopher J. Sullivan
    • Philip D. Barnard, PE
    • David Frinsco
    • Michael T. Gunter, PE, EVP
    • Chad P. Kirlin, PE, PMP
    • Greg Lamberson
    • Pete D. Luan, PMP
    • Charles W. Miller
    • Carolyn L. Morgan, CPA
    • Sean P. Pellegrino, PE
    • Leslie Rucker, CSP
    • Rodney Crawford, CPA
    • Kip Hamilton, CPA, CFE
    • Joel Murovitz, LEED AP
  • Contact Us
  • Client Login
  • Home
  • About Interface
    • Overview
    • News and Press Releases
    • Case Studies
    • Interface Articles
    • Employment Opportunities
  • Expert Services
    • Construction Claims & Disputes
      • Construction Delay Claims
      • Labor Productivity Claims
      • Design and Construction Defect Claims
      • Force Majeure Claims
      • Acceleration Claims
      • Suspension and Termination Claims
      • Differing Site Conditions Claims
      • Change Claims
    • Construction Defects
    • CPM Schedule Analysis
      • Windows Analysis or Contemporaneous Period Analysis
      • Time Impact Analysis (TIA)
      • Collapsed As-Built
      • Impacted As-Planned
      • As-Planned vs. As-Built
    • Construction Management
      • Contract Administration
      • Implementation of Project Controls
      • Execution of Processes and Procedures
      • Change Management
      • Risk Management
    • Litigation & Arbitration
      • Prudence Evaluation Experts
      • International Arbitration Construction Experts
      • Labor Productivity Analysis Experts
      • Schedule Delay Experts
      • Damage Quantification Experts
      • Design & Construction Defects Experts
      • Acceleration Experts
      • Suspension & Termination Experts
      • Force Majeure Experts
      • Differing Site Conditions Experts
      • Construction Change Experts
      • Standard of Care
    • Project Advisory
      • Construction Readiness Assessment
      • Contracting Strategy Development
      • Cost Risk Assessment
      • Project Audit
      • Project Execution Planning
      • Project Framing
  • Industries Served
    • Buildings & Facilities
      • Buildings
        • Education
        • Government Buildings
        • Commercial Buildings
        • Retail
      • Healthcare
      • Entertainment, Sports & Convention Centers
      • Industrial & Manufacturing
      • Multifamily Housing & Hotels
        • Multifamily Housing
        • Hotels
    • Transportation & Infrastructure
      • Airports
      • Heavy Civil
      • Roads, Highways, Bridges & Rail
      • Utilities
      • Water & Wastewater Treatment
    • Oil & Gas Pipelines
      • Land Pipelines
      • Subsea Pipelines
    • Marine & Offshore Production
      • Offshore
      • Ports, Piers & Wharfs
      • Shipbuilding & Vessels
    • Power & Energy
    • Chemical & Petrochemical
    • LNG & NGL
    • Oil & Gas Processing
    • Refining
    • Megaprojects
  • Interface Experts
    • Sam Barakat, PE, Esq., PSP
    • Jacob P. Hammond, CST
    • Lisa Sumner Heard
    • Dennis R. Jasinski, Fellow – ICCP
    • Mohamed W. Khazragui
    • Angela E. Lopez
    • Karen P. Matthews
    • Nicholas V. Ninan
    • Gabriel Paglicawan
    • Tapan Patni
    • Christopher J. Sullivan
    • Philip D. Barnard, PE
    • David Frinsco
    • Michael T. Gunter, PE, EVP
    • Chad P. Kirlin, PE, PMP
    • Greg Lamberson
    • Pete D. Luan, PMP
    • Charles W. Miller
    • Carolyn L. Morgan, CPA
    • Sean P. Pellegrino, PE
    • Leslie Rucker, CSP
    • Rodney Crawford, CPA
    • Kip Hamilton, CPA, CFE
    • Joel Murovitz, LEED AP
  • Contact Us
  • Client Login

Is Design Build Right For Your Project

by Bennett Coleman
Construction ManagementJuly 30, 20070 comments

Over the past 20 years, the design-build process has gained popularity throughout the engineering and construction industries. The Design-Build Institute of America estimates that by 2010, approximately 50% of all construction projects in America will use design-build. Regardless of whether these projections prove to be accurate, it is impossible to ignore that more projects are employing this alternative project delivery method. As shown in the table below, some projects lend themselves readily to the design-build process, while others continue to be constructed using the traditional design-bid-build process.

Design-Bid Build

  • Project Requires Heavy Owner Involvement
  • Unique/Complex Facilities
  • Residential
  • High-End Commercial (Custom Features)
  • Heavy/ Specializes Industrial Facilities

Design-Build

  • Less Owner Involvement Required
  • “Cookie Cutter” Projects
  • Gas Stations, Fast Food Restaurants
  • Highways/Utilities/Light Industrial
  • Public Schools

What is Design-Build?

Design-build is a construction methodology in which the owner contracts with a single entity to perform the design and construction for a project. The design-build process implements the same general procedures as the long-established design-bid-build construction process; however, it creates a closer working relationship between the engineering/design and construction phases by combining the construction and engineering resources into one team.

On traditional construction projects, the owner enters into a contract agreement with an architect/engineer to perform the preliminary conceptual design, project specifications, and subsequent detailed engineering. After the engineer has completed or nearly completed the detailed design drawings, the owner puts the project out for bid, and a separate construction contractor is awarded the work. Only at this time is the owner is able to “lock in” a price for the actual construction and completion of the project.

On design-build projects, the preliminary design and bid selection processes overlap and the design and construction phases of the work are combined into a single contract. This integration of activities reduces the overall project duration. The design-build concept is very similar, and well suited, to a fast-track construction process, as illustrated in the following graphic.

In design-build, the owner outlines general conceptual and/or performance requirements before entering into a contractual arrangement with the design-builder to perform the work. The design-builder expands on the owner’s general requirements, incorporates these ideas into a design, and subsequently constructs the facility. The design-build process necessitates that the construction team become actively involved in the engineering phase and requires the architect/engineering team to work closely with the construction contractor to provide information and answer questions during the construction phase. This complementary relationship between the engineer and contractor differs from a traditional design-bid-build project where the architect/engineer and construction contractor often have different ideas regarding what constitutes a successful project.

Will Design-Build be Successful for Your Project?

The design-build process offers pros and cons for both owners and design-build contractors. Owners benefit from the potential cost savings and from having single-point responsibility with the design-build contractor, which reduces risk. The owner may also realize cost savings based on a shorter overall project schedule, which provides for earlier income generation as well as optimum engineering and construction techniques/methods from the design-build team.

On design-build projects, the owner relinquishes control of the project design to the design-build team. The owner must be aware that on a traditional design-bid-build project, the architect, in most cases, acts as the owner’s representative. On design-build projects, however, the architect/engineer is working with the construction contractor and is no longer the owner’s representative; therefore, there is a potential loss of checks and balances. The owner should provide either in-house quality control or employ an outside consultant to protect the owner’s interests and ensure a successful project.

For the design-build contractor, design-build provides more continuity and teamwork between the engineering and construction teams, which can lead to faster project completions with higher profit potential. In addition, many design-build contracts provide monetary incentives to the design-build team for completing the project on time and within budget. On the other hand, the design-build entity assumes additional risk for providing the conceptual design, detailed engineering, and construction of the facilities. This means the construction contractor assumes risk/responsibility for the project’s design aspects and the designer assumes risk/responsibility for the quality and timeliness of construction.

Conclusion

The design-build process is not the best strategy for all projects and trying to make it fit for every project may lead to significant problems. However, as it is refined and more owners and contractors become familiar with the process, design-build will continue to gain popularity and become an increasingly effective project delivery method.

Source: Interface Consulting International, Inc.

Released: July 30th, 2007 11:00 AM

Phone: (713) 626-2525

Fax: (713) 626-2555

Email: contact@interface-consulting.com

An Ounce of Prevention: Creative Solutions for Change Orders May Avoid Costly LitigationPrev
Contracts Must Be ReasonableNext

Categories

CONTACT US

To find out how our Construction Consultants and Experts can assist you, or for other inquiries, please call 800.626.0054 or

EMAIL US NOW

The views expressed in this article are those of the author(s) and not necessarily the views of Interface Consulting, its management, or its other professionals.

logo

Interface Consulting provides a portfolio of professional support services to a wide range of clients including owners, contractors, attorneys, engineers, insurers, and suppliers involved in the engineering and construction process.

Quick Links

  • About Interface
  • Industries Served
  • News & Press Releases
  • Interface Articles
  • Interface Experts
  • Employment Opportunities
  • Client Login

Expert Services

  • Construction Claims & Disputes
  • Construction Defects
  • Construction Management
  • CPM Schedule Analysis
  • Litigation & Arbitration
  • Project Advisory

Corporate Office

  • Interface Consulting International, Inc.
  • 5847 San Felipe Street, Suite 1910
  • Houston, TX 77057
  • contact@interface-consulting.com
  • 800.626.0054(Phone)
  • 713.626.2555 (Fax)
  • Get Directions
  • Branch Offices
  • Naples, Florida
       
  • Interface Consulting
  • Terms of Use
  • Privacy Statement
  • Site built with Port City Media.