logo

800.626.0054

 
     
  • Home
  • About Interface
    • Overview
    • News and Press Releases
    • Interface Articles
    • Employment Opportunities
  • Expert Services
    • Construction Claims & Disputes
      • Construction Delay Claims
      • Labor Productivity Claims
      • Design and Construction Defect Claims
      • Force Majeure Claims
      • Acceleration Claims
      • Suspension and Termination Claims
      • Differing Site Conditions Claims
      • Change Claims
    • Construction Defects
    • CPM Schedule Analysis
      • Windows Analysis or Contemporaneous Period Analysis
      • Time Impact Analysis (TIA)
      • Collapsed As-Built
      • Impacted As-Planned
      • As-Planned vs. As-Built
    • Construction Management
    • Litigation & Arbitration
      • Prudence Evaluation Experts
      • International Arbitration Construction Experts
      • Labor Productivity Analysis Experts
      • Schedule Delay Experts
      • Damage Quantification Experts
      • Design & Construction Defects Experts
      • Acceleration Experts
      • Suspension & Termination Experts
      • Force Majeure Experts
      • Differing Site Conditions Experts
      • Construction Change Experts
      • Document Management & Optical Character Recognition (OCR)
      • Discovery Assistance
      • Demonstrative Evidence – Exhibit Preparation
    • Construction Advisory
      • Risk Management
  • Industries Served
    • Buildings & Facilities
      • Buildings
        • Commercial Buildings
        • Education
        • Government Buildings
        • Retail
      • Healthcare
      • Entertainment, Sports & Convention Centers
      • Industrial & Manufacturing
      • Multifamily Housing & Hotels
        • Multifamily Housing
        • Hotels
    • Transportation & Infrastructure
      • Airports
      • Heavy Civil
      • Roads, Highways, Bridges & Rail
      • Utilities
      • Water & Wastewater Treatment
    • Oil & Gas Pipelines
      • Land Pipelines
      • Subsea Pipelines
    • Marine & Offshore Production
      • Offshore
      • Ports, Piers & Wharfs
      • Shipbuilding & Vessels
    • Power & Energy
    • Chemical & Petrochemical
    • LNG & NGL
    • Oil & Gas Processing
    • Refining
  • Interface Experts
    • Frank G. Adams, PE
    • Philip D. Barnard, PE, CCP
    • Cody L. Crawford
    • Jacob P. Hammond
    • Lisa Sumner Heard
    • Thomas M. Hetzel
    • Amanda L. Larson
    • Angela E. Lopez
    • Karen P. Matthews
    • Carolyn L. Morgan, CPA
    • Lauren E. Purcell
    • Michael A. Purtell
    • Eric K. Rodriguez, PE
    • Matthew S. Scheps, PE
    • Gray T. Slocum
    • Rachel M. Smith
    • Christopher J. Sullivan
  • Contact Us
  • Client Login
  • Home
  • About Interface
    • Overview
    • News and Press Releases
    • Interface Articles
    • Employment Opportunities
  • Expert Services
    • Construction Claims & Disputes
      • Construction Delay Claims
      • Labor Productivity Claims
      • Design and Construction Defect Claims
      • Force Majeure Claims
      • Acceleration Claims
      • Suspension and Termination Claims
      • Differing Site Conditions Claims
      • Change Claims
    • Construction Defects
    • CPM Schedule Analysis
      • Windows Analysis or Contemporaneous Period Analysis
      • Time Impact Analysis (TIA)
      • Collapsed As-Built
      • Impacted As-Planned
      • As-Planned vs. As-Built
    • Construction Management
    • Litigation & Arbitration
      • Prudence Evaluation Experts
      • International Arbitration Construction Experts
      • Labor Productivity Analysis Experts
      • Schedule Delay Experts
      • Damage Quantification Experts
      • Design & Construction Defects Experts
      • Acceleration Experts
      • Suspension & Termination Experts
      • Force Majeure Experts
      • Differing Site Conditions Experts
      • Construction Change Experts
      • Document Management & Optical Character Recognition (OCR)
      • Discovery Assistance
      • Demonstrative Evidence – Exhibit Preparation
    • Construction Advisory
      • Risk Management
  • Industries Served
    • Buildings & Facilities
      • Buildings
        • Commercial Buildings
        • Education
        • Government Buildings
        • Retail
      • Healthcare
      • Entertainment, Sports & Convention Centers
      • Industrial & Manufacturing
      • Multifamily Housing & Hotels
        • Multifamily Housing
        • Hotels
    • Transportation & Infrastructure
      • Airports
      • Heavy Civil
      • Roads, Highways, Bridges & Rail
      • Utilities
      • Water & Wastewater Treatment
    • Oil & Gas Pipelines
      • Land Pipelines
      • Subsea Pipelines
    • Marine & Offshore Production
      • Offshore
      • Ports, Piers & Wharfs
      • Shipbuilding & Vessels
    • Power & Energy
    • Chemical & Petrochemical
    • LNG & NGL
    • Oil & Gas Processing
    • Refining
  • Interface Experts
    • Frank G. Adams, PE
    • Philip D. Barnard, PE, CCP
    • Cody L. Crawford
    • Jacob P. Hammond
    • Lisa Sumner Heard
    • Thomas M. Hetzel
    • Amanda L. Larson
    • Angela E. Lopez
    • Karen P. Matthews
    • Carolyn L. Morgan, CPA
    • Lauren E. Purcell
    • Michael A. Purtell
    • Eric K. Rodriguez, PE
    • Matthew S. Scheps, PE
    • Gray T. Slocum
    • Rachel M. Smith
    • Christopher J. Sullivan
  • Contact Us
  • Client Login

Contract Disputes

by Bennett Coleman
Construction ClaimsJuly 30, 20070 comments

The construction contract is the most critical document in a construction project, because it defines the contractor’s scope of work and compensation. It also establishes the responsibilities, liabilities, and warranties of both the contractor and the owner. As such, a contractor must carefully consider the contract language when bidding a job. The construction contract establishes the rules for the entire project, but does not always predict the way the project will be managed.

Generally, the contractor’s measures for preventing disputes during the bid stage include:

  • Proper and timely performance of the contractor’s contractual pre-bid duties, whether explicit or implied. These include site visits, material take-offs, and evaluation of key requirements for the work such as insurance and bonding.
  • Careful reading of the proposed general terms and conditions of the contract and evaluation of risks imposed by these terms and conditions.
  • Appropriate action to clarify, modify, or eliminate exposure to contract language that imposes intolerable risks on the contractor.

Review of the General Terms and Conditions

Contracts frequently include language that attempts to shift risks associated with a project from owner to prime contractor and from prime contractor to subcontractor. Owners generally receive better value and experience fewer problems through fair contracting. Nonetheless, contractors must be aware that unfair contracts exist and remain vigilant in preparing their bids.

Any proposed contract should be reviewed with respect to the future. The contractor should think through the project as the proposed contract is reviewed. Contracts that are fair and in common use do exist, including federal government construction contracts and some of the negotiated standard forms sponsored by trade organizations. But other contracts can be dangerous to the contractor if used as written. Ordinarily, any analysis or revision must be done before the contract is executed, or it cannot be done at all.

Exculpatory clauses come to our attention daily. Many are accepted by contractors in order to obtain the work. Contractors should review the proposed contract with these questions in mind:

  • Is there a no-damages-for-delay clause? If a delay costs money, signing a contract with a no-damages-for-delay clause could be a guarantee that the contractor will lose money should a delay occur.
  • Is liability for design transferred to the contractor? Does the contract require the contractor’s agreement that the design is sufficient? Does the contractor know whether the design is sufficient? What are the consequences to the contractor if the design is insufficient?
  • Can the contractor’s schedule be changed or his work disrupted by others, without compensation? If the contractor loses control of the work, the original estimate is meaningless.
  • Is the contractor asked to guarantee anything beyond its control that cannot reasonably be priced or insured against? Soil conditions? Weather? Supply of items not shown on the drawings? Cooperation of third parties? What are the potential consequences of each of these to the contractor?
  • Does the contract provide a workable means of recovery for extra work and for extension of contract time? If unexpected circumstances occur, will the contractor be covered?

Beyond addressing the above issues, good advice is to read the contract word for word and carefully consider what it requires. This is not a chore reserved only for lawyers. Estimators, engineers, and managers can read and understand contracts, and they must do so if they are to properly protect their company’s interests. If the contract contains requirements that are onerous, unfair, or impossible, the profitability of the project is at risk.

When intolerable language is found in a contract, the proper course of action depends upon whether the prospective bid is for public works or for private owners. Bids to government entities cannot ordinarily be qualified, whereas private sector bids can take exception to the proposed contract. Furthermore, public and private entities are driven by motivations that differ from each other. Thus, the following sections address the contractor’s reactions to intolerable language in two parts, covering private bidding and public bidding.

Private Bidding

When bidding to a private owner, contract language is inherently subject to negotiation. If there are contract provisions in the request for proposal that are intolerable, a contractor’s best course of action is generally to qualify the bid. This may be done in a variety of ways. If the problems are found in a small number of clauses, the contractor’s offer can explicitly take exception to those clauses and propose modifications.

However, if the proposed contract is unfair throughout, correction is not productive, and alternative action is necessary. One such alternative is to take exception to the whole contract and to propose a recognized standard contract form, such as an American Institute of Architects’ form.

Another approach is to indicate in the bid that portions of the owner’s proposed contract language are not acceptable and to quote a price that is “subject to the execution of a mutually agreed contract.” This approach is attractive to contractors who give numerous telephone quotations.

With this approach, a contractor can avoid effort spent in revising a contract until the client expresses interest in the proposal. Additionally, this form of qualification may be less likely to offend an owner.

When any form of qualification of the bid has been used, the contractor should not expect the owner to accept the qualifications without negotiation, since the negotiated terms of a contract may greatly affect profitability.

Public Bidding

While public owners may be at liberty to draft their contract language as they see fit prior to bid, the law typically prevents them from accepting bid proposals that would alter the language after the bid. When a public request for bid contains harsh terms, the contractor faces a difficult dilemma, as the options are limited. We suggest that all of the following actions be seriously considered:

  • Contractors should submit pre-bid questions to seek clarification of any contract language that is confusing. “What if” questions may be very useful in this context.
  • If an agency issues a request for tender with contract clauses that are unfamiliar and harsh, contractors should protest these clauses immediately.
  • For any given risk imposed by contract language, contractors should consider whether the risk can reasonably be covered by a contingency or by insurance.
  • If contractors cannot adequately protect themselves from liabilities imposed by a contract, they should consider not bidding.

Conclusion 

There is a widespread belief, or myth, among contractors that unfair language in contracts will not be enforced, or that it cannot be applied beyond some “reasonable” point. Although an owner may be at liberty to ignore a harsh contract, there is no obligation to do so. A harsh provision might be overturned in court, but litigation is costly to both the contractor and the owner. It is delusory for a contractor to assume a favorable outcome of an unfair contract. The only safe conclusion for a contractor is that a contract will mean what it says.

Source: Interface Consulting

Released: July 30th, 2007 11:00 AM

Phone: (713) 626-2525

Fax: (713)626-2555

Email: contact@interface-consulting.com

Category: construction claims analysis

Subcategory: interface

The Rules of Engagement and Construction Claims: Towards a Smooth Construction Contract Execution and Responsible Claims ProcessPrev
Design Documents and Design-Related ClaimsNext

Categories

CONTACT US

To find out how our Construction Consultants and Experts can assist you, or for other inquiries, please call 800.626.0054 or

EMAIL US NOW

The views expressed in this article are those of the author(s) and not necessarily the views of Interface Consulting, its management, or its other professionals.

logo

Interface Consulting International, Inc., is a leading construction consulting firm providing a portfolio of professional support services to a wide range of clients including owners, contractors, attorneys, engineers, insurers, and suppliers involved in the engineering and construction process.

Quick Links

  • About Interface
  • Industries Served
  • News & Press Releases
  • Interface Articles
  • Interface Experts
  • Employment Opportunities
  • Client Login

Expert Services

  • Construction Claims & Disputes
  • Construction Defects
  • Construction Management
  • CPM Schedule Analysis
  • Litigation & Arbitration
  • Construction Advisory

Main Office

  • Interface Consulting International, Inc.
  • 5847 San Felipe Street, Suite 1910
  • Houston, TX 77057
  • contact@interface-consulting.com
  • 800.626.0054(Phone)
  • 713.626.2555 (Fax)
  • Get Directions
     
  • Interface Consulting
  • Terms of Use
  • Privacy Statement
  • Site by Port City Media